How Much Concrete Fits in a Sonotube? Work It Out Per Pier, Then Multiply

A sonotube pier is a cylinder — work out one tube, then multiply by the number of tubes.

The formula

Volume per tube = π × (diameter ÷ 2)² × depth, all in feet.

A worked example: one 12 in tube at 48 in deep

  • Volume: π × 0.5² × 4 = 3.14 cubic feet
  • Cubic yards: 3.14 ÷ 27 = 0.12 cubic yards
  • Bags: about 6 × 80 lb bags with 10% waste

Eight of those tubes need 25.13 cubic feet, 1.02 cubic yards with waste, 47 bags — about 6 bags per tube.

Tube sizes

Standard deck posts use 10–12 in tubes; 14–16 in suit heavy beams.

How deep?

Footings must go below the local frost line — 36 in minimum is a common deck rule, but northern frost lines run 48–60 in, so confirm with your building department.

Practical tips

Allow 6 in of gravel under the concrete, buy tubes 6–12 in longer than needed so you can level them cleanly at grade, and peel the above-grade cardboard 24–48 hours after pouring.

If you would rather not do the arithmetic by hand, run the same numbers through a sonotube concrete calculator — it works out any pier layout in one step.